RainSpace™ Installation
RainSpace (5,000 gallons) Jacksonville, Oregon
RainSpace Install (17,000 gallons) Grants Pass, Oregon
The RainSpace installation process is simple:
Design
Contact our office and we’ll put you in touch with a specialist who can help you design the entire system and create an installation plan to meet your specific needs.
Preparing the site
Once designed, the complete kit will be delivered to your site. In preparation for the RainSpace™ system’s arrival, excavate according to the installation plan provided.
Installation
The pre-folded liner is placed into the excavation, unfolded and held in place with a temporary frame made from 2x material. Once positioned, the extraction wells and input and overflow piping are placed in their proper locations, and a layer of core tubes is installed. Backfill is then placed around the outside of the liner, corresponding with each successive layer of core tubing.
Final touches
Once the core is complete and the perimeter is backfilled, the liner top is sealed into place. Backfill is then carefully placed over the top in layers, compacted and built up to the proper elevation according to the plans. Once the backfill is in place, accessories such as traffic boxes, covers, filters, and plumbing lines can be connected and the system put into service.